Ransom House

Global Sitelink cameras were installed on this domestic house build to not only capture the time-lapse of the whole project, but to give our client web browser access 24/7 to see first hand the progress on site.

This access allowed our client to monitor and make critical decisions about the project immediately, saving time and money whilst minimising delays.

BMA Dragline Walking Project

4 Enormous coal draglines (3400 tonnes each) were walked together from Norwich Park Mine to Saraji Mine, then floated to Peak Downs and Cavill Ridge Mines in the Bowen Basin.

This project was months of ground based filming and time-lapse footage as the slow moving giants made their way North at 120 metres per hour across major highways and railway lines. A "never seen before" and probably a "never to be seen again" exercise captured by Global Sitelink.

Mine Site Shed

Construction site time-lapse video of mine site shed build.

3 month site build with 4G connectivity enabling managers to log in remotely from 900kms away and check site progress live on a daily basis.

Feed Transfer Facility Cover

Construction Site time-lapse video of Woodlands Feed and Poultry transfer facility skillion shed cover. For this short term 4 day construction the Global Sitelink mobile trailer was deployed and was set up and fully 3G connected within an hour of arriving on site. This enabled virtually instant recording of high definition footage and remote live monitoring of the site by company directors 300km away.

 